Analysis of the bed load balance in the head waters of the Leitha river. – work package 2 |
|
| Awarding authority: |
Bureau of the Lower Austrian provincal government |
| Province: |
Lower Austria |
| Project area: |
Schwarza/Pitten/Leitha |
| General management: |
ARC - Seibersdorf research GmbH /Mag. Philip Leopold |
| Sub project management: |
Surveying , hydrology: DI Dr. Peter Mayr |
|
Hydraulics und sediment: DI Stefan Sattler |
| Project description: |
Module I: Enquiry of existing data, problem analysis in the catchment area |
|
Module II: Detail mapping and definition of the target state. |
|
Module III: Design suggestions (versions) – gravel sedimentation basin Lanzenkirchen |
| Water body: |
Leitha / Schwarza / Pitten |
| Editing time: |
2005 - 2007 |
| River length: |
20km / 15km 1D- bed load and hydraulic modelling / 1.2km 2D hydraulic modelling and sediment analysis |
| HQ100: |
ca. 400 m³/s |
|
|
Read more...
|
|
|
Hazard zoning for the municipalities of Irschen, Dellach, Berg, and Greifenburg in the upper Drau valley |
|
Awarding authority: Bureau of the carinthian province government
Province: Carinthia
Project area: Oberes Drautal
General management: DI Dr. Peter Mayr
Sub project management: DI Ingo Niederbichler
Project description: Generation of hazard zone maps according to RIVA-T 2006 and guidelines for hazard zoning 2006 for the municipalities of Irschen, Dellach, Berg, and Greifenburg
Water body: Drau
Editing time: Juli 2008 - Juli 2009
River length: 20 km
HQ100: 1025 m3/s |
|
Hydraulic engineering & ecology Vorarlberg river training with regards to the requirements of the water framework directive |
|
Awarding authority: Bureau of the provinzial government of Vorarlberg
Province: Vorarlberg
Project area: Ill, Bregenzerach
General management: DI Stefan Sattler
Sub project management: DI Ingo Niederbichler
Project description: Generation of desing types based on flow situation and space availability - interdisciplinary project
Water body: Ill, Bregenzerach
Editing time: 2007-11/2009
River length: 2 Abschnitte mit je 3*2 km
HQ100: 690 - 1100m3 /s
|
|
Read more...
|
|
Gravel sedimentation areas Saalach/Maishofen 2D Hydraulic and bed load modelling |
|
Awarding authority: Bureau of the provincial government of Salzburg
Province: Salzburg
Project area: Saalach - Bereich Maishofen
General management: DI Stefan Sattler
Project description: detailed 2d hydraulic modelling for the widening areas on the river Saalach near Maishofen – Generation of 2d hydraulic model for optimizing the design of the widening areas
Water body: Saalach
Editing time: 2005 - 04/2006
River length: 3,5 km
HQ100: 165 m3 /s
|
|
Read more...
|
|
Flood control of river Drau for municipalities of St. Peter, Molzbichl, and Amlach |
|

Awarding authority: Bureau of the Carinthian provincal government
Province: Carinthia
Head project: Life II Obere Drau St. Peter (Flkm 63,0-68,1)
Project area: St.Peter, Molzbichl, Amlach
General management : DI Dr. Peter Mayr
Sub project management: DI Ingo Niederbichler
Water body: Drau
Editing time: 2005 - 2009
River length: 5 km
HQ100: 1600 m3/s
|
|
Read more...
|
|
River care concept Saalach: AP 5 – sediment regime |
|

Awarding authority: Federal Ministry of Agriculture, Forestry, Environment and Water Management/Bureau of the provincial government of Salzburg
Province: Salzburg
Project area: Pinzgau / Bertesgaden (D)
General management: DI Stefan Sattler Sub project management: DI Ingo Niederbichler
Project description: Illustration and analysis of the sediment regime in the river Saalach within the scope of the river care concept – work package 5: bed load
Water body: Saalach
Editing time: 2005 - 01/2006
River length: 71 km (58,5 km Detailbearbeitungsbereich)
HQ100: 92-800 m3/s
|
|
Read more...
|
|
River bed stabilisation Drau near Obergottesfeld |
|
Awarding authority: Bureau of the Carinthian provincial government
Province: Carinthia
Project area: Drau near Obergottesfeld
General Management: DI Dr. Peter Mayr / DI Stefan Sattler Sub project management: DI Ingo Niederbichler
Project description: Elaboration of a catalogue of measures for restoration of river bed stability (flood control difficulty) for the Drau river in the area of Obergottesfeld/Sachsenburg and transformation of the Drau river according to GBK-Drau
Water body: Drau
Editing time: April 2004
River length: 4 km
HQ100: 1029 m3/s
|
|
Read more...
|
|
|